Skip to Content
chevron-left chevron-right chevron-up chevron-right chevron-left arrow-back star phone quote checkbox-checked search wrench info shield play connection mobile coin-dollar spoon-knife ticket pushpin location gift fire feed bubbles home heart calendar price-tag credit-card clock envelop facebook instagram twitter youtube pinterest yelp google reddit linkedin envelope bbb pinterest homeadvisor angies

Project: Amazon DCA2 Fullfillment Center – Sparrow’s Point
General Contractor: Clayco

Scope: Furnish and install all docks and doors for this 1.4M square foot facility in Trade Point Atlantic’s new development which has quickly become one of the major economic engines for Baltimore. The project included Amarr sectional overhead doors and track guards, Kelley hydraulic dock levelers, truck restraints, dock seals and rain shields, lights, fans, bumpers and wheel chocks. As the exclusive dealer of Kelley dock equipment, we have a special partnership with Amazon and outfit all of their buildings.